Site Digitization Hub
Connect every site to the fleet — and bring us in the moment it passes FID
V1.0
Distribution: Engineering, Project Managers, Digital Leads, O&M, Region & Country MDs
The situation
We build new renewable capacity at a pace of
7.5 GW per year — industrial scale of construction. The
opportunity now is to connect and monitor that fleet at the same scale. Plug a site
into the whole R&F fleet and it gains what scale makes possible: comparing the
same inverter or turbine model across countries to catch underperformance fast,
and turning what one country learned from a fault into a warning for the next.
That is what industrialization looks like for our sites.
Be Data&Digital Ready by Provisional Acceptance
In one line
Connect every site to the SCADA backbone by Provisional Acceptance,
and bring in the Site Digitization Hub the moment a site passes FID. The country
owns the deliverable; the SDH is the expert capability that helps you reach it.
1
Fleet scale makes every site stronger
why connection matters
Connect a site to the SCADA backbone — the R&F data lake — and it joins
the fleet at scale: compared against the same asset model running elsewhere, and
strengthened by what another country already learned. Every day it's connected is
a day it adds to what makes the rest of the fleet smarter.
Compared across the fleet
A connected site can be set side by side with the
same inverter or turbine model running in another country — underperformance
shows up in days, not seasons.
Warned ahead of time
When one country has already met a fault, the fleet carries that
lesson forward — the next site is warned before it happens, not after.
Ready by PA
Digital-readiness belongs inside the acceptance milestone.
Connected by Provisional Acceptance means a site enters operation already part
of the fleet.
2
Connect once, stay free to choose
the backbone as integration layer
The question is not which monitoring tool is best. We are at the start of a rapid
expansion in tooling — AI-driven performance analysis and capabilities that do not yet
exist are arriving faster than any procurement cycle. The real risk is wiring your sites
directly to today's winning application, and being the one left re-integrating when
the next one arrives. Connecting to the SCADA backbone is how you stay free to choose.
The SCADA backbone — the R&F data lake — is an integration layer.
You connect a site to it once. Applications then plug in on top: stop logbook,
availability tracking, performance analysis — whichever you choose, today or in future.
A site connected to the backbone is option-rich. A site wired straight to a single
application is locked to it — and pays the reconnection cost on every switch.
Direct to application
Locked in
Every site wired to every tool. Switch vendors and you
reconnect every site.
Through the backbone
Free to choose
Each site connects once. Swap applications above the line —
the sites never move.
Where we stand · honest status
The principle holds the moment a site is on the backbone, and the tag-mapping
foundation that makes application swaps tractable is already in place. A full
end-to-end swap between applications is on our roadmap — the direction is set, the
proof is in progress. We will commit to the friction numbers once we have demonstrated
them, not before.
3
The SDH helps; the country owns it
a capability at your side
The Site Digitization Hub is a capability built to help countries get their
sites data- and digital-ready by Provisional Acceptance. The distinction below
is the most important thing to take from this page.
You remain accountable
The country owns the deliverable
Connecting your sites to the SCADA backbone — the
R&F data lake — by Provisional Acceptance is your target and your
accountability. Getting your sites data- and digital-ready is something
the country delivers. That does not change.
The SDH helps you get there
A capability at your side
The SDH is the expert capability that helps you hit that
target. We bring the tools, the materials and the people so you reach a
connected site by Provisional Acceptance — but the deliverable stays yours. We help you succeed;
we do not take it off your plate.
Behind the SDH is a small, deliberately senior team of top SCADA and engineering
experts — fully dedicated to this mission and growing. It is the depth of
expertise that matters, not the size of the team: deep enough to solve the hard
parts of site digitization with you, lean enough to stay sharp.
4
A working capability, ready to use
tools, materials, plan and tracking
The SDH comes with a working set of capabilities: tools that do the heavy
lifting, materials that brief every party, a plan you execute together, and tracking
that keeps it honest.
SDH Suite · Tool
Site Studio
Reads your SCADA engineering PDFs — single-line diagrams,
weather-monitoring stations — and generates the full site hierarchy:
every monitored equipment from substation to feeders, transformers and inverters,
AC and DC, and how they relate.
Maps site tags to the backbone standard — both
rule-based and full LLM-generated mapping — so signals arrive correctly
named and structured, not reconciled by hand after the fact.
Generates progress views on a weekly, monthly and
quarterly cadence — so countries, SCADA Backbone and leadership all see the
same picture of where every site stands.
A site should not pass Provisional Acceptance while it is still digitally unready.
Digital-readiness — connected to the SCADA backbone, data flowing into the R&F data
lake — belongs inside the Provisional Acceptance criteria. When it does, Provisional Acceptance stops being
a date a site can slip past unmonitored, and becomes what it should be: the guarantee
of a connected, fully visible asset.
Be Data&Digital Ready by Provisional Acceptance
6
At FID, bring in the SDH
the one thing to do
The one thing to do
For every new site that passes the FID milestone, make sure you
involve the Site Digitization Hub. Bring us in early, and together we make
sure your site is connected — and ready — by Provisional Acceptance.